19
Aug
2022
Construction commences on vital link for Sydney's west
Construction of the new $2 billion, toll-free M12 Motorway is underway with work commencing on the central and west sections to provide connectivity to the new Western Sydney International Airport.
19
Aug
2022
Accelerating Australia's electric vehicle potential
The Albanese Government is unlocking the nation’s electric vehicle potential and putting in place the next steps to establish Australia’s first National Electric Vehicle Strategy.
18
Aug
2022
Breaking ground on M1 works Pimpama
Work has begun today on a major upgrade of the Exit 49 (Pimpama) Interchange to improve safety and bust congestion on the M1.
16
Aug
2022
Jobs and skills in focus at infrastructure, transport and regional roundtables
Minister for Infrastructure, Transport, Regional Development and Local Government Catherine King is today meeting with industry, unions, local government and peak body groups and other stakeholders for a roundtable on jobs and skills in the nation
16
Aug
2022
All aboard: date set for opening of METRONET Forrestfield-Airport Link
It's all systems go for the $1.86 billion METRONET Forrestfield-Airport Link, which is set to begin operations on 9 October.
16
Aug
2022
Boom gates going in South Geelong
The dangerous and congested level crossing on Fyans Street in South Geelong will soon be a thing of the past, improving safety and traffic flow for the more than 14,000 vehicles that use the road each day.
15
Aug
2022
Site selected for Western Australia's new Aboriginal Cultural Centre
A world-class Aboriginal Cultural Centre for Western Australia is a step closer to becoming a reality with the selection of a Terrace Road site as the preferred location for the centre.
15
Aug
2022
Call for community to shape Caloundra connectivity
Community members are being invited to join a stakeholder interest group to improve access to the Caloundra CBD.
12
Aug
2022
Building for the future: Work underway to expand Tasmania’s northern gateway
Biggest infrastructure expansion program at Launceston in six years
11
Aug
2022
Charles Darwin University city campus reaches new heights
Northern Territorians are celebrating the rapid developments taking place on the Charles Darwin University’s (CDU) city campus build – the largest construction project underway in Darwin’s CBD, and one that will transform the city for decades to c
11
Aug
2022
New shiploader good news for Port of Burnie
The new shiploader for north-west Tasmania’s Port of Burnie has taken a huge leap forward, with local design and construction contractor COVA Haywards Pty Ltd having started the fabrication of the shiploader’s structural
11
Aug
2022
Minister tours on-track UTAS Inveresk campus site
The $304 million redevelopment of the University of Tasmania’s Inveresk Campus is on track for delivery by 2024.
10
Aug
2022
Construction to start soon on New Bridgewater Bridge
Tasmania’s largest ever infrastructure project, the New Bridgewater Bridge is expected to commence construction in the coming months, with early works already progressing on site.
10
Aug
2022
Majors on/off ramp a step closer
The Majors Road on/off ramp – providing southern suburbs commuters with better access to the Southern Expressway – is a step closer with community consultation now open.
09
Aug
2022
First section of $1 billion Gold Coast M1 upgrade now open
Traffic is flowing on six lanes of the Pacific Motorway (M1) between Varsity Lakes and Burleigh, with the first package of works of a $1 billion project now open.