Work on the first temporary Fitzroy River low-level crossing, a five metre-wide 200 metre-long, single-lane rock causeway, has been completed and will open t
Works are continuing as part of the $87.5 million Sturt Highway Corridor Upgrade, with new rest areas and pavement rehabilitation to be delivered between Ann